Which LED Bulb Categories Are Approved Under UN R37?

Five LED replacement light source (LEDr) categories are listed in UN Regulation No. 37 (often written ECE R37) through Group 5 of R.E.5: C5W, H8, H11, H16 and HB4. H8, H16 and HB4 took effect on 11 March 2026. H10, H9, HB3 and HIR2 are still in development and must not be described as approved. This page tracks the LED bulb categories approved under UN R37 with a date and a UNECE document behind every line, so a buyer can check each claim. A category listing is not a product approval, and it does not make a bulb suitable for every lamp. For the definition of an LEDr and how the approval works, see the Complete Guide to ECE R37 LEDr.

Which LEDr categories are approved today?

The table separates categories in force from drafts. Nothing in the second block is approved.

Category

Status

Effective date

Source

C5W

Effective, listed in R.E.5 Group 5

Original listing date not covered by this page

ECE/TRANS/WP.29/2026/41, Group 5

H11

Effective, listed in R.E.5 Group 5

Configuration-2: 13 November 2024

ECE/TRANS/WP.29/2024/156; status table in 2026/41

H8

Effective, added to Group 5

11 March 2026

ECE/TRANS/WP.29/2026/41

H16

Effective, added to Group 5

11 March 2026

ECE/TRANS/WP.29/2026/41

HB4

Effective, added to Group 5

11 March 2026

ECE/TRANS/WP.29/2026/41

H10

In development. Informal draft, not adopted

None

GRE-94-19, listed on the GRE 94th session page

H9, HB3, HIR2

Indevelopment. Named with H10 in the GRE development cluster, not adopted

None

GRE-94-18 (informal, April 2026)

WP.29 adopted ECE/TRANS/WP.29/2026/41 at its 198th session in March 2026, as recorded in the session report (paragraph 76). The R.E.5 status table in that document gives 11 March 2026 as the effective date of version 12, and version 12 is the revision that added H8, H16 and HB4 to Group 5. Together with C5W and H11, that makes the five categories in the top block. The earlier H11 change has its own date: Configuration-2, introduced by ECE/TRANS/WP.29/2024/156, took effect on 13 November 2024 according to the same status table. Those dates describe different changes to the regulation and should not be merged into one “approved on” date for H11.

The lower block is the development pipeline. GRE-94-19 is an informal draft for H10, and GRE-94-18 names H9, HB3 and HIR2 together with H10 as a later cluster of high-beam categories. Informal working documents show where the research is heading. They do not change the regulation, and none of these four categories has a UN R37 category sheet in force.

H4 and H7 sit in a third group. Neither is listed in R.E.5 Group 5. Some countries run national approval schemes that tie an LED bulb to a list of specific vehicle models. A scheme of that kind is not a UN R37 category approval, and a bulb sold under one should not be called an LEDr approved under UN R37.

How does a category get approved?

A new category does not appear in the regulation overnight. The path documented in UNECE working material starts with a technical study and an equivalence report. It moves through informal and then formal proposals at GRE, the Working Party on Lighting and Light-Signalling, and on to adoption at GRE. WP.29 and its administrative committee AC.1 then review the proposal, and the category enters force through a combined amendment to R.E.5 and R37. UNECE’s public documents set no fixed duration for this path.

For a buyer, the reading rule is short. A category counts as approved when it is listed in Group 5 of an R.E.5 revision that WP.29 has adopted, and the status table of that revision shows an effective date. An informal draft, a GRE agenda item or a supplier’s remark that a category is coming does not meet that test. Every category in the lower block of the table above currently fails it.

A practical example shows why the split matters. A supplier offers an “H10 LEDr” with a CE mark and an R10 reference. H10 sits in the lower block, so no UN R37 category sheet exists for it yet, and neither marking can substitute for one. The same logic applies to an H7 or H4 bulb sold with an E-mark: the mark alone does not place the bulb in Group 5. Reading every offer against the table takes a minute and removes most of the ambiguity.

What is allowed, and what is not proven?

You can state that C5W, H8, H11, H16 and HB4 are the LEDr categories listed in R.E.5 Group 5, using the dates in the table. You can state that H10, H9, HB3 and HIR2 are in development and not adopted. You can state that H4 and H7 are not listed in Group 5. Each statement should carry the review date shown at the top of this page. Dates matter here because the list changes when WP.29 adopts a new R.E.5 revision, and a table quoted without a review date can be out of date within a session cycle.

The list does not show which lamp function a bulb may serve. Group 5 allows these categories only in lamps approved with a filament light source of the same category designation. Low beam, fog or any other function therefore depends on the original lamp approval and on what the matching filament category is permitted to do. The list also says nothing about a specific vehicle, a specific product or the rules of a specific country. Road use in any market depends on the approval conditions, the lamp and vehicle, and local enforcement, so this page makes no road-legality claim for any category. A supplier who turns this list into “legal for every car” is claiming more than the source supports.

Which categories do buyers ask about most?

H11 was already in Group 5 before the March 2026 additions, and H8, H16 and HB4 are the newest members of the approved block. For a side-by-side view of the approved category against H7 and H4, see the H11 vs H7 vs H4 LEDr comparison.

H7 is not in Group 5. Its current status, the technical barriers and the risks in supplier claims are covered on the H7 LEDr status page.

H4 is not in Group 5 either. The dual-beam design and the reasons it is harder to replace than a single-function category are covered on the H4 LEDr status page.

How can a buyer check the current status?

Start with the latest revision of R.E.5 on unece.org and read its status table, which names the version and the effective date of each change. Then confirm adoption in the WP.29 session report for the session concerned. To see what is coming, open the document page of the relevant GRE session; the GRE 94th session page lists the draft documents discussed there, including the H10 draft.

Then ask the supplier to name the category and the approval document for the exact product, and compare both with the table on this page. The certificate check itself is covered in the guide on how to verify an ECE R37 H11 LEDr certificate.

What should B2B buyers do next?

Match the product you plan to buy to a category in the top block of the table. If it belongs to the lower block, or to H4 or H7, treat any “approved” claim as unverified until the supplier shows a UN R37 approval document for that exact category. For a listed category with a current product, the ECE R37 certified H11 LEDr product page covers OEM and wholesale terms and the documents available on request. Buyers who want a note when the list changes can subscribe to category updates.

What should importers verify before relying on this list?

Match the category printed on the product to one in the top block of the table, then confirm that the R.E.5 revision behind it carries an effective date. Ask the supplier for the UN R37 approval document covering that exact product. A category listing proves neither the product nor the document. Compare the review date on this page with the latest R.E.5 revision on unece.org before you quote the list to a customer.

What is the next step for B2B buyers?

Pick a listed category, request the approval document for the exact product, and compare it with the table on this page before placing an order. If the category you need is H4, H7 or one of the drafts, use the status pages linked above and treat any “approved” wording from a supplier as unverified.

Sources

  • UN Regulation No. 37, Revision 7, Amendment 11 (consolidated text): unece.org
  • ECE/TRANS/WP.29/GRE/2025/17, proposal for the H8, H16 and HB4 LEDr categories: unece.org
  • ECE/TRANS/WP.29/2026/41, R.E.5 Amendment 12: unece.org
  • ECE/TRANS/WP.29/1190, report of the 198th WP.29 session, paragraph 76: unece.org
  • GRE-94-18, LEDr category development status, April 2026 (informal): unece.org
  • GRE 94th session document page, including GRE-94-19 (informal draft): unece.org


By Jack Liu, Co-founder & Product Director, LEDOAUTO.

Regulatory review: LEDOAUTO Engineering Team, verified against official UNECE documents.

Last reviewed: 15 July 2026.